13325120155
Contact Us

Contact:Mr.Wang

Phone:13325120155

QQ: 2696757323

Email:jgwangchao@126.com

Address:Room 506, Building 1, Shangdong Mansion, No. 766 Zhenguan Street, Tangye New District, Licheng Distr

Products

Your position:HomePage >> Products>> Seat>> 5D seat installation

5D seat installation

方特游乐设备生产厂家,大型游乐设备制造,<a href='/' target='_blank'>球幕飞行影院</a>,水上游乐设备,过山车立柱制作

The installation of amusement equipment differs from that of other industries. In some industries, businesses can install the equipment manually, but for large-scale amusement equipment, professional technicians are required to arrive at the site to carry out foundation construction, followed by a series of steps including installation, reinforcement, and operation, in order to ensure that the amusement equipment will not encounter problems during future operation.

During the installation process, technical personnel need to measure the dimensions of the site, carry out reasonable structural division and planning, with different people responsible for different parts. Additionally, foundation work needs to be carried out, using the correct tools and procedures for operation and reinforcement. Then, the installation of equipment begins. Each piece of steel and fiberglass needs to be labeled in order to prevent technical personnel from making installation errors. This way, there will be no half-finished situations during the installation process, which could delay the customer's scheduled business hours. The production time for fiberglass is relatively long, and if there is any damage, it cannot be made in a short time. Therefore, during the installation of fiberglass, great attention must be paid to stability to avoid unnecessary losses for the customer.

In addition, during the process of electrical equipment installation and wiring, careful inspection must be conducted to ensure that wires are not exposed in easily accessible locations, preventing wire exposure and resulting in electric shock injuries or deaths. After installation, a test run inspection should be conducted to confirm that all operations are normal before allowing the customer to inspect the equipment.

After the equipment installation is completed, technical personnel and operators need to provide operation training to the customer, including how to switch the equipment on and off, set the time, adjust the speed, use and replace hydraulic oil and lubricating oil, install, replace, and repair parts; how to solve problems, how to check, and a series of other issues; in addition, a copy of the equipment's user manual should be provided to the customer for backup and easy reference.

The technical process of amusement equipment is complex, so it is essential to have high requirements for equipment installation to ensure customer satisfaction and peace of mind for the manufacturer. If an unknown fault occurs with the equipment, it is important to contact the manufacturer for inquiry and troubleshooting, rather than blindly repairing it, which could result in unnecessary losses.

Recommended products